DOT temporarily opening US 385 for Sturgis Rally

3 months ago 8

SIOUX FALLS, S.D. (KELO) -- A major highway in the Black Hills will pause construction and temporarily reopen during the Sturgis Motorcycle Rally.

Sturgis Rally causes city liquor store to stock up

The South Dakota Department of Transportation (SDDOT) announced it pause all construction on U.S. Highway 385 starting Wednesday, July 31 and resume construction Tuesday, Aug. 13. During those days, the highway will reopen to traffic with one and one-half times of gravel surfacing from Highway 44 to Silver City Road.

The DOT said it will treat the gravel to control dust and the speed limit through the construction zone will be reduced to 45 mph during the rally.

In addition to reopening US 385, the DOT will operate several temporary traffic devices and speed reductions in the Black Hills during the Sturgis Motorcycle Rally.

2024 Sturgis Rally concerts: Dates and locations

Traffic signals will start operating Tuesday, July 30 through Monday, Aug. 12 at the following locations:

...
Read Entire Article